Materials

Storage Room Shelving: PIPP Mobile Storage Systems Inc.
Cashwrap/Backwrap and Fixtures: Fleetwood
Millwork and Fixtures: Misko Inc.
Signage, Wall Standards: US Sign and Mill Corp.
Wheelchair Lift: Garaventa Lift
Anti-theft Equipment: Checkpoint Systems Inc.
Security System: Vector Security
Sound System: PlayNetwork
Reclaimed Wood: Urban Evolutions
Storefront and Fixtures: C. Chandler Co. Inc.
Custom Door Pulls and Custom Hardware: IronStudio

Retrofit Team

Client Designers and Planning: URBN Inc., Philadelphia
Senior Planning Manager: Jennifer Calliagas
Construction Manager: Tony Igneczi
Store Design Director: Robert Jamieson
Designers: Jenna Murphy, Leslie Mignin, May Narisaranukul

Architect of Record: NewStudio Architecture, White Bear Lake, Minn.
Principal in Charge: Sean M. Wagner, OAA, AIA, LEED AP
Project Lead: Adam Jarvi, AIA
Project Staff: Brita Hauser, Assoc. AIA; Maureen Smith Johnson, Assoc. AIA; and Marcy Conrad-Nutt, AIA
Survey Team: Adam Jarvi, AIA, Wale Falade, Assoc. AIA

Structural Engineer of Record: Advanced Structural Technologies, Edina, Minn.
Principal in Charge: David C. Buchanan, P.E., SE, P. Eng.

MEP Consultants: Hallberg Engineering Inc., White Bear Lake
Principal in Charge: Paul Fettinger, P.E., LEED AP
Project Staff: Michael Bleeker, P.E., and Dave Quigley, P.E.

MEP Engineer of Record: Cronnox Inc., Oakville, Ontario, Canada
Principal in Charge: Mark Peric, P. Eng.
Project Staff: Sandor Kosa

Code Consultant / Permit Expediter: Michelle Grant, OAA, SimonJames, Toronto

General Contractor: SAJO, Montreal
Project Manager: George Meckel, Director

About the Author

Melissa Martyr
Melissa Martyr is the director of operations at NewStudio Architecture, White Bear Lake, Minn.

Be the first to comment on "A Toronto Church Built in 1864 Is Recast to Complement an On-trend Merchandiser"

Leave a comment

Your email address will not be published.


*


%d bloggers like this: